Ground floor refurbishment in Blackheath

Job involved removal of the existing laminate flooring, skirting, radiators and sliding aluminium door leading to the rear garden.

Re-pluming new Accova radiators, new PIR insulation on top of the existing concrete floor then toped of with P5 chipboard and then for the finish 19mm hardwood flooring for the perfect finish. New Bi-folding triple glazed door supplied and installed, new skirtings and re-decorate throughout.